Installation of Deep Tube Wells In Nepal Water Supply Corporation - Lahan branch office, Lahan Municipality

                                                                                                                  Terms of Reference 

                                                                                                     Installation of Deep Tube Wells 
                                                                                                                           In 
                                                                      Nepal Water Supply Corporation - Lahan branch office, Lahan Municipality

1. Introduction: 

WaterAid is an international not-for-profit organization, established in 1981, determined to make  clean water, decent toilets and good hygiene normal for everyone, everywhere within a  generation. We change millions of lives every year, working in 28 countries to provide clean  water, decent toilets and good hygiene.  

Since we started in 1981, we’ve remained resolutely focused on tackling these three essentials  that transform people’s lives. Without all three, people can’t live dignified, healthy lives. With all  three, they can unlock their potential, break free from poverty, and change their lives for good.  Children grow up healthy and strong, women and men get to earn a living, whole communities  start to thrive. It sounds normal and it should be.  

By inspiring people and sparking chain reactions we help deliver lasting change in what’s  normal. By working closely with partners internationally and on the ground in some of the  toughest places in the world, we help achieve widespread change. Millions of people have  already taken control of their lives and built better futures. 

WaterAid has been working in Nepal since 1987. Our work in Nepal spans across 4 districts.  We team up with local partners, technical experts, governments, and communities to support  the delivery of integrated WASH services in hard-to-reach communities, helping to transform  lives. 

2. Background: 

WaterAid Nepal is currently implementing the Project entitled “The Beacon Project: Municipality  Wide equitable WASH Services in Lahan: A joint initiative of Anglian Water, their Alliance  partners, WaterAid, and Nepal Water Supply Corporation (NWSC)” in Lahan municipality,  Siraha District of Nepal. The overall objective of the project is to support Nepal to achieve the  Sustainable Development Goal for water and sanitation by implementing the WASH sector plan.  The specific objectives are to: 

  1. Model a municipal-wide approach in Lahan as part of the district-wide model for Siraha  district.  
  2. Support the efficiency and expansion plans of NWSC in Lahan with a focus to reach  marginalized and poor communities 
  3. Leverage the model in Lahan for district and national benefit. 

In the current context of Nepal, where majority of the rural areas are in transition to transform to  the small towns of municipal towns, their needs are also changing accordingly. In these  contexts, the unsystematic and unsupervised borehole drilling and construction that were done  in the past years needs to be changed and come up with new mode of thinking technically and  systematically. In this regard, WaterAid visualized that the technical endeavours in borehole drilling, and its supervision is of paramount importance if one thinks of their sustainability and  appropriateness technically. 

Beacon project aims to support technically to NWSC to increase the efficiency of the existing  tube well system and add four more deep tube wells to supply the safe water to the increasing  population of Lahan Municipality.  

3. Rationale: 

Under The Beacon Project, one of the integral components is Water Resources. This  component aims to ensure the improved water production, monitoring, and prevention of  possible contamination. This can be attained with the greater functionality and sustainability of  water sources which in Lahan mostly are boreholes. Under this component, Beacon project  aims to support technically to NWSC in the construction of model boreholes in Lahan  municipality for its replication and scalability to other branches and within Lahan as well.  

It is crucial that boreholes are delivered in a cost-effective manner. Cost effectiveness means  getting the long-term best value for money invested, i.e., boreholes continue to function through  the lifespan of 20 to 50 years. One of the best ways to tackle the poor borehole construction is  to improve the quality and professionalism of water well drilling including supervision (Rural  Water Supply Network (RWSN), 2014). In addition, ensuring compliance with the relevant Nepal  standards and/or Indian standards regarding the material quality also ensures the standardised  product. Thus, it is desired to bring the competitive and excellent drilling company to undertake  drilling and construction of Deep tube well for NWSC Lahan as part of support from Beacon  project. 

NWSC currently have six functional boreholes as their key production sources namely OC3,  OC8, BHA2, TCN1, TCN2 and Ashram1 located at different locations. Discharge of each well is  used to serve population. As per the increase in population additional tube well need to serve  for the municipality.  

Increasing population in the years to come may create water stress. Therefore, the need of  water per household needs to decide the number of future tube wells. So, additional tube well  needs for increasing population and rehabilitation of the existing well, if possible, could be the  reasonable solution. 

4. Objective: 

The overall objective of the work is to improve the supply of safe water to the networks of  NWSC Lahan. The specific objectives of the work will be to: 

  • Install four deep tube wells in four locations of NWSC Lahan facilities. (Refer Annex I - Detail technical specification and Bill of Quantities) (Refer Annex V – Maps showing  location of proposed boreholes) 
  • Develop well and perform pumping test/recovery test as per the technical specification. 

5. Scope of the Assignment 

The scope of the contractor shall include, but not be limited to, the following activities over a  period of 5 Months. 

  1. Assure the timely installation of four Deep Tube wells at the locations provided by NWSC.
  2. The Vendor will follow up with the concerned authorities, legal, statutory, and  administrative formalities, permits/approvals for delivering/installing the deep tube wells. 
  3. Proper health and safety measures shall be ensured amongst the workers following the  Government's and WAN's safety guidance for working during Covid-19 and Dengue situation. 
  4. The Quality control will be made with the regular supervision by NWSC, WAN and  Consultant. 

For Detailed ToR Please "CLICK HERE"
For Full Specification for drilling for deep tube well Please "CLICK HERE"
For Full Specification Please "CLICK HERE"
For detailed BOQ Please "CLICK HERE"
For Annex A, B, C Checklist Please "CLICK HERE"
For Annex D Checklist Please "CLICK HERE"
For Annex IV Scoring Critereons Please "CLICK HERE"