Assistant Plant In-charge (Electrical Overseer)
CEDB Hydropower Development Company Limited

CEDB Hydropower Development Company Limited (CHDC), a public limited company incorporated under the prevalent laws of Nepal on Mangsir 15, 2066 (November 30, 2009). CEDB Hydropower Development Company Limited (CHDC) was founded by the then Clean Energy Development Bank to provide equity investment for hydropower projects to meet energy needs of the nation. CHDC is currently mandated to invest in and develop Hydropower Projects. It has got three hydropower projects in operation and four projects at construction and development stages.

Projects Under Development/ Construction

1. Tallo Khare Khola Hydropower Project (11 MW) (Dolakha)

2. Dordi-1 Hydro Electric Project (12 MW) (Lamjung)

3. Rukum Gad Hydropower Project (5 MW) (Rukum)

4. Kasuwa Hydropower Project (45 MW) (Sankhwasabha)

Assistant Plant In-charge (Electrical Overseer)

Views: 810 | This job expired 2 months ago

Basic Job Information

Job Category : Construction / Engineering / Architects
Job Level : Mid Level
No. of Vacancy/s : [ 2 ]
Employment Type : Full Time
Job Location : Dolakha & Lamjung
Offered Salary : Negotiable
Apply Before(Deadline) : Mar. 17, 2019 23:55 (2 months ago)

Job Specification

Education Level : Other
Experience Required : More than or equals to 2 years
Other Specification

  • Must have completed Diploma in Electrical Engineering
  • Minimum 2 years of experience in Hydropower


Job Description

  • Installation, Testing & Commissioning of Hydropower Project
  • This is a site based position

This job has expired.

Job Action

TO APPLY: For this job, please follow the applying procedure.


Register Now

More Jobs By this Company

Similar Jobs

job_detail_page
Search, Apply & Get Job: FREE